Deep in the Gobi Desert’s golden sands, a modern engineering marvel is rising: the 750kV Tarim Basin Rim Power Grid. Stretching across Xinjiang’s rugged terrain, this project is battling sandstorms, mountain ranges, and desert extremes to bring reliable energy to southern Xinjiang. 💨🏔️
The final phase—linking Hetian to Minfeng, Qiemo, and Ruoqiang—is a "marathon through nature’s obstacle course", as one engineer put it. Teams are drilling through the Kunlun Mountains and navigating shifting dunes, proving that even the harshest landscapes can’t stop progress. 🚧🔧
Once complete, the grid will form a 1.08 million sq km energy loop, supercharging the region’s shift to sustainable power and boosting economic growth. Think of it as a superhighway for electrons—paving the way for solar farms, tech hubs, and greener industries. 🌱💡
Reference(s):
cgtn.com